Capabilities and Records

By using its equipment capabilities, machineries, and technical know-how of its personnel, Taban Water Development Engineering Company has successfully finished projects based on monthly:

  • 1.2 million cubic meters of earth filling
  • 73 million cubic meters of structural concreting
  • 36 thousand meters of curtain and consolidation grouting
  • 9 thousand square meters of plastic concrete cut off wall
  • 49.5 meters of mechanized tunneling with a diameter of 9.15 meters per day
  • 27,000 meters of mechanized tunneling with a diameter of 9.15 meters per day

This company has recorded the experience of executing of more than 87000 meters different tunnels in the its background with the bellow mentioned specifications:

  • 27,000 meters with 9.15 m2 cross section.
  • 20,300 meters with 69 m2 cross section
  • 9,900 meters with 132 m2 cross section
  • 30,372 meters with 6.8 to 69 m2 cross section

Ineluctable to state that 8% of the tunnels executions has been done by road header machines and 44% with blasting method excavation and also 48% by means of TBM excavator.

We can mention the following items as a selection of the main company’s tunnel activities,:

  • 48,865 Meters road and rail tunnel execution
  • 21,370 Meters headrace and tailrace tunnels
  • 28,130 Meters Access galleries
TABAN Water Development Engineering Company is established to conquest the C and EPC projects by participation in the fields of design/ consultancy/ construction and monitoring the Geotechnical works/ cut of walls/ Diaphragm walls