دی ان ان evoq , دات نت نیوک ,dnn
Menu

.

Taban Water Development Engineering Company
Taban Water Development Engineering Company
Taban Water Development Engineering Company

Road and railway

Taking advantage of different machineries and equipment, this company has been successfully executed more than 153,225 meters length asphaltic cover road with the 4 to 22 meters width. Also the sandy cover roads with 81,045 meters total length, has been recorded in the company’s experience background.

The company has also a remarkable background in the bellow mentioned fields:

1-    Design and execution of metro lines with the 37,415 meterstotal length as underground lines, and 76,960 meters as open area lines

2-    185,100 meters total length for Track works

TABAN Water Development Engineering Company is established to conquest the C and EPC projects by participation in the fields of design/ consultancy/ construction and monitoring the Geotechnical works/ cut of walls/ Diaphragm walls
123movies Joshua vs Usyk 2 Live Joshua vs Usyk 2 Live Stream Joshua vs Usyk 2 Live Free Joshua vs Usyk 2 Live Joshua v Usyk Live Joshua v Usyk Live Stream UFC 278 Live UFC 278 Live Stream UFC 278 Live Free