Respective to using modern equipment, this company has been successfully executed 484,834 m2 cutoff wall with the technical specifications and special geology structure. Also, the execution of cutoff wall by means of hydraulic cutter with the max depth 124 meters, have been recorded in the company’s executional background in the special geology condition. It is ineluctable to state that, is fully capable to execute grout curtain and consolidating works with the 3,273,236 meters length and 100 m Average Depth.
The average construction record in this sector reaches to 36,000 meters length per month.